中文版  |  ENGLISH 
   
  

行业新闻

NEWS

行业新闻

当前位置:首页 > 行业新闻


Tianjin's extended navigation channel completed
作者:   来源:   更新:2012/7/9

THE Port of Tianjin's 300,000-tonne navigational channel dredging project has been finished, Xinhua reports.

The CNY1.4-billion (US$220.3 million) project began in March last year, which covers a distance of 33.3 kilometres. It was an expansion on the existing 250,000-tonne navigational channel, dredged from 19.5 to 21 metres and extended from 44 to 45.5 kilometres.

 
  Copyright:XIAMEN ODIN LOGISTICS CO.,LTD Add:Room 6B Moufu Building,Xiangyu Free Trade Zone,Xiamen
TEL:0592-6038356(40 lINES) FAX:0592-6038359 5682339.